Last assignment Real Construction that build a little cute dome also take 7 hours to complete.But,this time I gonna make a big geodesic dome within 30 minutes with 2 friends.This sound like MISSION IMPOSSIBLE.Rules of making big geodesic dome really tough for me especially ["Carryable" only by groups members]
In my opinion,get an idea,design an concept of dome and consider other factor must put in top priority instead of gather all that materials.So,there are require us consider a lot of thing for making this dome.First,base of dome must not too big or it cannot be carried by my teamate.Secondly is way to make a base with bamboo?Connect it with glue?? screw??connecter??Actually I also not sure way to build it.Thirdly gonna most important that is dome must float when 3 people go up.Component to make dome float must have air inside that component but where I get such component??There still got a lot of problem....BLA...BLA...BLA...BLA...It just look like endless.
There are 3 model of our dome design but there are its pros and cons for each model.Further discussion is needed for decide our dome.
We set our team name as KEDAH BOY-BOY because we 3 people are from Kedah state.Wow!! thing just occur coincidently.I put my product name as "EVAC" and it stand for evacuation when 2012 occur.
More information refer to CLICK HERE
My HBP RAG 132 Assignment
Monday, 9 August 2010
Monday, 2 August 2010
Real Construction [28th July2010]
This assignment have to build a geodesic dome with bamboo stick.Check it out at desert domes-dome calculator to get a reference.I choose 18.3cm as my 2V dome's radius because length of strut A is 11.30cm while length of strut B is 10.00cm.It will quite easy for me because I no need to round off that length.
First time I use cellophane tape to stick the strut but i totally just screwed because it doesn't work at all.Masking tape is better choice.
There are 35 strut A and 30 strut B for geodesic dome.
This is basic roof structure of geodesic dome.
Roof of geodesic dome is almost complete.
Roof is complete.
Basic structure for base of geodesic dome.
Base is complete.
When ROOF+BASE and it will transform into..........................
That dome take almost 7 hours to complete and it is quite tiring but have some fun too upon saw that dome complete.
First time I use cellophane tape to stick the strut but i totally just screwed because it doesn't work at all.Masking tape is better choice.
There are 35 strut A and 30 strut B for geodesic dome.
This is basic roof structure of geodesic dome.
Roof of geodesic dome is almost complete.
Roof is complete.
Basic structure for base of geodesic dome.
Base is complete.
When ROOF+BASE and it will transform into..........................
That dome take almost 7 hours to complete and it is quite tiring but have some fun too upon saw that dome complete.
Tuesday, 20 July 2010
Virtual Construction [14th July 2010]
As 2 picture showed above,what can we see???Of course,it is traffic jam.Traffic jam is most annoying and headache thing ever for all driver.That sort of traffic jam had been occur every peak hour such as school day,tuition,hypermarket jumbo sell and many more.So,this sort of traffic jam had been occured for over 10 years.Every driver always blaming and complaining for over 10 years because of traffic jam.
Here come the first element!
=-=-=-=-=-=-=-=
INTENTION
=-=-=-=-=-=-=-=
Every driver sure intent for build larger road or make another route to reduce traffic jam for encounter that problem over 10 years.They have been intense for that projek launch since 1999.But,they have been awaiting for a long time until now 2010 KEDAH maju make some move to solve that annoying problem.
Picture 1
Picture 2
=-=-=-=-=-=-=
ACT
=-=-=-=-=-=-=
Here come the action when Kedah Maju 2010.Government wanna upgrade alor star when 2010 is around the corner.They are 4 upgrade projek but there are 2 projek currently commenced where 2 picture showed above,while other 2 projek temporaily halted.
Picture 1 showed that actor is that worker with orange uniform.He is currently making the land flatten.They will build a tar road when that work is completed.
Picture 2 is remake bridge that already build over 20 years.When 2010 Kedah maju has come,all facilities will be upgrade include that old bridge.That big machine is used to destroy that old bridge.
Picture 1 showed that actor is that worker with orange uniform.He is currently making the land flatten.They will build a tar road when that work is completed.
Picture 2 is remake bridge that already build over 20 years.When 2010 Kedah maju has come,all facilities will be upgrade include that old bridge.That big machine is used to destroy that old bridge.
=-=-=-=-=-=-=-=
PRODUCT
=-=-=-=-=-=-=-=
That picture above is product but you maybe will questioning why product is a broken bridge.That progress had been commenced for 1 month but only 1/10 part of bridge have been destroyed even though workers had been working from day until midnight 12.00.If you wanna see a completely brand new bridge,you need wait for 1 or 2 years for this bridge to be complete.That time i will upload a rebuild bridge for you become my first witness.
=-=-=-=-=-=-=-=
ACTOR
=-=-=-=-=-=-=-=
This 3 workers are actors.They are currently pouring cement on the ground and make it spread uniformly on the ground.Anyway,i really not sure the use of cement road.But that mystery will be reveal when that site is completely build.
=-=-=-=-=-=-=-=
RULE
=-=-=-=-=-=-=-=
Principle is care your safety as you walking around the construction site because there is working of destroying bridge.Besides,there is also frequent bypass of train for transporting build materials.It will be fatal if we are careless around that place.
=-=-=-=-=-=-=-=
PLACE
See the center of the map called "ALOR STAR"??There is place where the building projek KEDAH maju 2010 working on.For specific location is Jalan Teluk Wanjah.